Carbon Dioxide Ventilation System

Our Installation Team recently completed minor upgrades to a Barrel Hall in a winery at the Barossa Valley.

We needed to ensure that we exhausted large amounts of carbon dioxide laden air from the Barrel Hall, with the system only operating when the carbon dioxide levels increase to unsafe levels.

To reduce energy losses, an air to air heat exchange system was installed.

We designed our new installation to allow the existing carbon dioxide monitoring / alarm system to remain, resulting in a much more cost-effective solution.